A REAL TIME PLANNING Budgeting Solution – Manufacturing Industry
OVERVIEW
The company has been using Enterprise Planning tool for budgeting from last 5 years. The model consist of RSV (Realisable Sales Value by Project), Budget Application, MMI Application, PMS application for Business unit and MTR application for Business Unit.
The EP model was earlier developed by some another team and the later on our team has made some changes for performance tuning in the same application.
BUSINESS NEED
As the individual application size was big, for each model individual applications were created as data size holding constraint in EP
As PMS, Budget and MMI applications are inter dependent on each other admin links were created to flow the data from one application to another. So if end user wants to see project wise PBIT they have to dependent on the IT team to run the admin links which easily eat 20 min to half hour, only after that they can see the PBIT for individual project. We can imagine now there are around average 160 projects are running in each BU and if they want to arrive a PBIT or the other parameter how much time they have to spend to calculate so.
This was a major pain which was facing by them as they were running with certain assumptions to arrive at their final numbers and also leads to increase in the Budget Cycle finalization process days, which used to take almost a month to finalize the Budget numbers. And also required one resource full time for running those admin links.
Business want to remove the dependency to run the admin links to update the data into different application, as it was consuming time and also thy have to wait for running links to finalize their numbers.
They want a system which will give real time result for example. If they enter Cost for Projects in MMI application, in real time it shows same cost and PBIT in Budget application. Where in EP to arrive this they need to run admin links to do so.
Reduce the dependency on the technical team and providing more insight to the business users.
THE SOLUTION
Design and develop all the applications in single server.
Every applications are link with each other real-time, which reduce the efforts and waiting time spend on running admin links.
As everything becomes real time finance and budget end user can easily change the parameters to arrive at their required numbers.
THE BENEFITS
The budget process cycle time which used to take 1 month for 5 to 6 resource of FNA team with team to 3 it has been finalized in 12 days.